TECHNICAL OPERATION AND MAINTENANCE MANAGEMENT FOR THE CITY CHILDREN HOSPITAL

TECHNICAL OPERATION AND MAINTENANCE MANAGEMENT FOR THE CITY CHILDREN HOSPITAL

    In December 2021 Sicom Construction Investment Joint Stock Company officially signed a service contract for maintenance of technical systems for the City Children's Hospital in 2021-2023.

     

    Accordingly, Sicom will perform preventive maintenance, corrective/ reactive/ proactive maintenance of all MEP technical systems of the Hospital, including:

    • Fire protection system;
    • Chiller System;
    • UPS system;
    • Generator system;
    • RO system;
    • Nurse call alert system;
    • Sample transfer system;
    • Elevators & Escalators system;
    • BMS system;
    • Waste water treatment system;

    PROJECT INFORMATION

    - Address: No.15, Vo Tran Chi Str, Tan Kien, Binh Chanh, Ho Chi Minh City

    - Type of the project: Civil (medical) work

    - Size of the project: 1.000 beds. The project has 1 basement and 8 floating floors

    - Total floor area: 93.181,61 m2

    - Total investment of the project: about 4.500 billion VND 

    Sicom
    Facebook
    Zalo
    Hotline