OPERATION OF TECHNICIAN SYSTEMS AT ONCOLOGY HOSPITAL

OPERATION OF TECHNICIAN SYSTEMS AT ONCOLOGY HOSPITAL

    After more than 1 year of operating the Oncology Hospital - a high-tech treatment area at Facility 1 (No Trang Long, Binh Thanh), Sicom is trusted and given to operate the technical systems of the Oncology Hospital - facility. 2 in District 9. Oncology Hospital - Facility 2 has a scale of 1,000 beds, meeting the highest standards for construction of the Ministry of Health with over 90 m2 per hospital bed, with a helipad for emergency cases. especially.

    Project information:

    - Construction site: No. 12, Road 400, Cay Dau Hamlet, Tan Phu Ward, District 9, HCMC.

    - Type of project: Civil (medical) works; Works of grade I, group A; Investment scale: 1,000 beds.

    - Investor: The Department of Health Construction Investment Management Unit (now is the Construction Investment Project Management Board of Civil and Industrial Works). Total investment of the project: 5,845,040,000,000 VND.

    - Total land use area: 55,594m2; Area suitable for planning: 48,761m2; Construction area: 18,933m2; Total work floor area (including basement area): 119,876m2.

     

    Sicom
    Facebook
    Zalo
    Hotline